: Reinforced Concrete
: Haldun Ibrahim Demirhisar
: Haldun Ibrahim Demirhisar
: Ascend Hotel Collectıon
: Project Manager (Haldun Ibrahim Demirhisar)
Size : 1 Basement+5= 6 Floor 7.820 m²
127 standart, 4 Suits, 1 Disabled Rooms
1 Restaurant, 4 Meetig Rooms,
Spa, Indoor and outdoor Swiming Pools
: Managed To The Design Office, Project Management Of Design Development, Pre-Preparing Cost Analysis And Cost Plans, Consulted On Design And Construction Process, Monitoring Construction, Managed The Sub-Contracting and Implementation,Enabled The İnternal Communication Between Subcontractor.